Public Agenda NewsPaperPublic Agenda NewsPaper
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Font ResizerAa
Public Agenda NewsPaperPublic Agenda NewsPaper
Font ResizerAa
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Search
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Follow US
Breaking NewsGeneral Newstop stories

More communities will be wiped into the sea if Akosombo dam breaks down – VRA

Suleman
Last updated: October 16, 2023 12:12 pm
Suleman
Share
3 Min Read
SHARE

The Volta River Authority (VRA) has warned that nothing will be saved if the Akosombo Dam overtops its operational level.

It said it was for that reason it may have to continue spilling more water from the dam if its current level rises to avert any unforeseen catastrophe.

Edward Obeng Kenzo, Deputy Chief Executive of the VRA, explained that the dam’s current water level is at 277.26 feet, and its maximum operational level is 277.5 feet.

More Read

PIAC elects Richard Ellimah as new chair
Nsawam City Sporting Club Secures International Transfers for Five Players
Ato Forson seeking prudence with 2026 Budget – Prof. Khalid
Youth Groups advocate for Economic Inclusion, Job Creation and more
STAR-Ghana Foundation launches Five-Year Strategy to boost Youth -Led Development

Speaking in an interview on the Citi Breakfast Show on Citi FM on Monday, he indicated that though the Authority has no plans of spilling more water in the coming days, Mr Kenzo underscored that anything beyond the operational level of the dam would break it and lead to the entire wipe put of persons and structures along the bank of the Volta river.

“We don’t want to spill any additional volume of water. We are tracking and with the data, we believe that we may not spill any volume of water. But if there should be any unexpected heavy rains into the dam, we’ll be compelled to spill. Where we are now we are around 277.26 feet of water behind the dam. The dam’s operational level is 276, the maximum allowable operational level of the dam is 277.5 feet.”

“So we are left with only about 0.24 feet to get to that maximum operational level of the dam. So any level beyond this, we are putting the dam’s integrity at risk. If the dam should break, the volume of water that will come out of the dam-all those along the banks of the river, all the way to somewhere around Tema will be wiped into the sea. No human being will be saved, no structure will be saved, nothing will be saved,” Mr Kenzo said.

The VRA commenced the controlled water spillage from the Akosombo and Kpong Dams on September 15, 2023, due to a consistent rise in the inflow pattern and water level of the Akosombo reservoir.

Thousands of residents in South Tongu, North Tongu, Central Tongu, Asuogyaman, and several other residents have had their homes submerged due to the spillage.

Source: CNR

Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print

Latest News

198km Accra–Kumasi Expressway to be completed in three years — Ato Forson
November 14, 2025
No Money in Ghana’s Mental Health Fund
November 14, 2025
Sudden altitude change caused August 6 helicopter crash – Report
November 11, 2025
Inequality, corruption, threaten Ghana’s moral fabric – Catholic Bishops
November 11, 2025
Fiscal Reforms Needed to Maximise Gains from Extractive Sector, Says IEA
November 5, 2025
Ghana’s Inflation Falls to Four-Year Low; hits 8% in October 2025
November 5, 2025
GRA boss, senior officials ordered to appear before OSP in SML probe
November 4, 2025

You Might Also Like

Breaking NewsGeneral Newstop stories

Bosomoa Forest Reserve under Threat as Community Clears 20 Acres for proposed health College project

November 4, 2025
Breaking NewsGeneral Newstop stories

ISODEC, Shai -Osudoku Assembly Honour Ford Foundation’s Legacy of Social Justice

October 30, 2025
Breaking NewsBusinessGeneral Newstop stories

NAIMOS, REGSEC dismantle illegal mining network in Oda River Forest Reserve

October 24, 2025
Breaking NewsBusinesstop stories

Gold Prices Plunge 6.3% in Largest Drop Since 2013

October 22, 2025

About Us

Public Agenda is fou­nded and owned by Pu­blic Agenda Communic­ations.

Public Agenda was founded as a public interest Me­dia entity. Its Visi­on is to contribute to building a well-i­nformed society where accurate informati­on dissemination is the cornerstone of a democratic, just and equitable society.

Its mission is to inform, guide and bui­ld responsible citiz­enship and accountab­le decision making and strive for excell­ence in the media in­dustry. Public Agenda Communications is managed by a Board of Directors.

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?