Public Agenda NewsPaperPublic Agenda NewsPaper
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Font ResizerAa
Public Agenda NewsPaperPublic Agenda NewsPaper
Font ResizerAa
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Search
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Follow US
Breaking NewsGeneral News

Work on Kotoka International Airport terminal 91% complete

Latifa Carlos
Last updated: March 20, 2018 2:21 pm
Latifa Carlos
Share
4 Min Read
SHARE

Work on the $250-million Terminal 3 project of the Kotoka International Airport (KIA) is 91 per cent complete and due to be inaugurated later this year.

When completed, the project can handle five million passengers a year, up from the approximately 2.5 million passengers that used to be handled at Terminal 2.

The Managing Director (MD) of Ghana Airports Company Limited (GACL), Mr John Dekyem Attafuah, said in an interview with the Daily Graphic that “Terminal 3 at Kotoka International Airport promises to be the game-changer as Ghana inches closer to become the destination of choice and the preferred aviation hub in West Africa.”

According to him, the construction of Terminal 3 was also in line with GACL’s mission of providing world-class airport facilities and services for the benefit of its stakeholders.

More Read

Sudden altitude change caused August 6 helicopter crash – Report
Inequality, corruption, threaten Ghana’s moral fabric – Catholic Bishops
Fiscal Reforms Needed to Maximise Gains from Extractive Sector, Says IEA
Ghana’s Inflation Falls to Four-Year Low; hits 8% in October 2025
GRA boss, senior officials ordered to appear before OSP in SML probe

“The terminal is designed to have modern facilities that will undoubtedly position KIA among the best equipped airports in the region,” Mr Attafuah said.

“In fact, this project fits into the GACL’s vision of positioning the country as the preferred aviation hub and leader in the airport business in West Africa,” he added.

The terminal, which is expected to be fully operational by the third quarter of this year, has six boarding aerobridges and can process 1,250 passengers per hour. It is fitted with three business lounges and a large commercial and retail area with a purpose-built transit facility.

Monumental feat

The KIA’s Terminal 3 has five levels spread across 45,000 square metres and parking space for 700 cars.

At the departure level, it has 56 check-in desks, 30 passport control centres and 80 security lanes.

The arrival area has 24 immigration counters, four electronic gate (e-gate) positions [expandable to eight] and four baggage reclaim devices.

The terminal is also equipped with a fully automated baggage handling system to handle both destination and transit luggage at 3,500 bags an hour.

Background

The idea of a new terminal was conceived as a compelling project in 2013 as an alternative to the refurbishment of Terminal 2, which was then on the drawing board.

At the time, the facilities in Terminal 2 constantly broke down, and congestion, especially at the arrival hall, had become a national security concern.

However, all indications pointed to the disruption of traffic and cost overruns that were attendant upon the refurbishment of what was clearly an outdated product.

The then board of the company took the bold decision to cut new grounds and, once it received support from the government, started work in earnest to secure funding for it.

The project is structured around a design-and-build basis by a Turkish construction company, MAPA Construction and Trade Company.

In 2014, work commenced on the expansion of the Terminal 2 arrival hall to ease the congestion experienced during peak hours. Currently, the existing floor area of the arrival hall has been expanded by 5,148 square metres

Additional works include electrical installations, fire detection and protection systems, provision and installation of two new baggage handling equipment to bring to four the number of baggage carousels in the arrival hall, provision and installation of 26 immigration booths, 10 e-gates, a moving walkway, and new air-conditioning systems.

 

Source: Graphic online

Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print

Latest News

Bosomoa Forest Reserve under Threat as Community Clears 20 Acres for proposed health College project
November 4, 2025
ISODEC, Shai -Osudoku Assembly Honour Ford Foundation’s Legacy of Social Justice
October 30, 2025
NAIMOS, REGSEC dismantle illegal mining network in Oda River Forest Reserve
October 24, 2025
Gold Prices Plunge 6.3% in Largest Drop Since 2013
October 22, 2025
BoG Governor targets full de-dollarisation, wants cedi to be sole currency for all transactions
October 22, 2025
ISODEC to Plant 650 Trees to celebrate Ford Foundation’s 65 years in West Africa
October 21, 2025
Cedi erases Q3 losses recorded in 2025; posts 37% year-to-date appreciation against dollar
October 21, 2025

You Might Also Like

Breaking NewsBusinesstop stories

Resource Extraction, Climate Change Driving Inequality in West Africa — ISODEC

October 21, 2025
Breaking NewsPoliticstop stories

Assibey Antwi, Gifty Oware to face court today over NSA ghost names scandal

October 17, 2025
Breaking NewsBusinesstop stories

Govt spending falls 14% below target — BoG Report

October 13, 2025
Breaking NewsDevelopment Agendatop stories

GES to phase out double-track system by 2027 — GES

October 13, 2025

About Us

Public Agenda is fou­nded and owned by Pu­blic Agenda Communic­ations.

Public Agenda was founded as a public interest Me­dia entity. Its Visi­on is to contribute to building a well-i­nformed society where accurate informati­on dissemination is the cornerstone of a democratic, just and equitable society.

Its mission is to inform, guide and bui­ld responsible citiz­enship and accountab­le decision making and strive for excell­ence in the media in­dustry. Public Agenda Communications is managed by a Board of Directors.

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?