Public Agenda NewsPaperPublic Agenda NewsPaper
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Font ResizerAa
Public Agenda NewsPaperPublic Agenda NewsPaper
Font ResizerAa
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Search
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Follow US
Breaking NewsNews paper Headlines

Parts of country will soon witness Loadshedding between April and June-GRIDCo

Suleman
Last updated: March 30, 2021 12:05 pm
Suleman
Share
2 Min Read
SHARE

The Ghana Grid Company Limited (GRIDCo), a power transmission firm, says it is in discussion with the Electricity Company of Ghana (ECG), to develop a Loadshedding timetable for power outages in some parts of the country.

The table will provide details of the time and places that would experience power outages at any point in time between April and June, this year.

Mr Ebenezer Amankwaah, the Corporate Communications Manager of GRIDCo, who confirmed this in a media interview, in Accra, said the loadshedding schedule will enable both the ECG and GRIDCo to inform their customers ahead of the outages.

More Read

GTMO Condemns Attack on Forestry Commission Checkpoint in Bono East Region
World leaders converge in Accra for high-level reparatory justice conference
Mining, water supply and transport emerge biggest drivers of Producer Price Inflation
“Men’s Mental Health: Breaking the Silence, Saving lives
NADeF Micro-Credit beneficiaries seek increased funding amid business growth

Some towns in the Greater Accra Metropolitan Area, Winneba in the Central Region and Greater Kumasi Metropolitan would be affected.

The schedule , he said, would, therefore, allow the residents in the affected communities to plan their social lives properly to minimise the adverse effects of the outages.

Explaining the rationale for the intended exercise, Mr Amankwaah stated that the engineers and contractors working on some transmission lines and bulk supply points needed to connect power into the system to reduce the burden on the existing electricity substations.

“There is the Pokuase Bulk Supply Point, which is being funded by the Millennium Development Authority (MiDA) and expected to take off some of the loads from the Accra substation.

” The load in Accra is increasing because of population growth and infrastructure development, and so we need a lot of substations to take off the loads on the existing ones.

Mr Amankwaah explained that the contractors and engineers undertaking the tie-in, therefore, requested between four days to two weeks to disconnect the power and perform the break-in.

Source:GNA

Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print

Recent Posts

  • GTMO Condemns Attack on Forestry Commission Checkpoint in Bono East Region
  • World leaders converge in Accra for high-level reparatory justice conference
  • Mining, water supply and transport emerge biggest drivers of Producer Price Inflation
  • “Men’s Mental Health: Breaking the Silence, Saving lives
  • NADeF Micro-Credit beneficiaries seek increased funding amid business growth
  • Gbetsile: Six-year-old girl drowns in septic tank while searching for water
  • Recurring Floods Continue to Threaten Lives and Property in Oyibi Community
  • Africa poised to lead global digital finance evolution — MTN CEO
  • Ghana risks outsourcing economic sovereignty under IMF PCI deal — ISODEC
  • Accountability Labs Engage Birim North Assembly on Development Needs
  • How Africa can escape the debt trap
  • US lists travel, visa requirements for World Cup fans
  • Mahama to lead decisive Cabinet meeting over Constitution Review today
  • Ghana’s economy expands by 7.7% in February 2026 – GSS
  • President Mahama urges African leaders to unite in tackling healthcare challenges
  • Chinese mining firm targets Ewoyaa lithium takeover in $210m deal
  • Ghana now 8th biggest economy in Africa
  • Mahama, appointees donate GH¢6.1m to Mahama Cares Fund

You Might Also Like

Breaking NewsGeneral Newstop stories

Gbetsile: Six-year-old girl drowns in septic tank while searching for water

May 25, 2026
MTN Group CEO & President, Ralph Mupita
Breaking NewsBusinesstop stories

Africa poised to lead global digital finance evolution — MTN CEO

May 20, 2026
Breaking NewsBusinesstop stories

Ghana risks outsourcing economic sovereignty under IMF PCI deal — ISODEC

May 20, 2026
Breaking NewsDevelopment Agendatop stories

Accountability Labs Engage Birim North Assembly on Development Needs

May 14, 2026

About Us

Public Agenda is fou­nded and owned by Pu­blic Agenda Communic­ations.

Public Agenda was founded as a public interest Me­dia entity. Its Visi­on is to contribute to building a well-i­nformed society where accurate informati­on dissemination is the cornerstone of a democratic, just and equitable society.

Its mission is to inform, guide and bui­ld responsible citiz­enship and accountab­le decision making and strive for excell­ence in the media in­dustry. Public Agenda Communications is managed by a Board of Directors.

  • Contact us
  • Advertise with us
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?