Public Agenda NewsPaperPublic Agenda NewsPaper
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Font ResizerAa
Public Agenda NewsPaperPublic Agenda NewsPaper
Font ResizerAa
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Search
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Follow US
Breaking NewsGeneral News

Wa Airstrip yet to be inaugurated over a year after completion

Latifa Carlos
Last updated: October 4, 2018 3:28 pm
Latifa Carlos
Share
3 Min Read
SHARE

The Wa Airstrip in the Upper West Region is virtually wasting away over a year after rehabilitation and expansion works on it were completed for use.

So far, it has been limited to presidential flights to and from the regional capital with no sign of the much anticipated commercial flights happening any time soon.

Staff at the Airstrip refused to speak to the Daily Graphic, citing strict orders, but there are concerns that the lack of commercial activities could lead to the facilities deteriorating fast.

The rehabilitation works were done by Messrs Skill Link Limited and although the refurbishment could not meet the original September 2016 handover deadline, it was eventually completed in the first quarter of 2017.

Facilities

The airstrip currently boasts a two-kilometre tarmac with a 40-metre width which makes it capable of hosting Code C type aircraft which includes Boeing 737-700 Airbus and Embraer ERJ 190-100. The tarmac is longer than that of the Kumasi Airport as it is now and secured with barbed wires.

The arrival and departure terminals with adjoining offices for airline agencies and ticket sales have also been fixed.

Dying enthusiasm

The enthusiasm that characterised the rehabilitation works had died out in the absence of concrete plans to begin commercial flight activities at the airstrip.

Currently, residents or persons wishing to travel to or from the region by flight can only connect through Tamale, which is between four and five hours drive from Wa.

A businessman, Mr Eric Dankwa Kissi, who is the Chief Executive of a maize processing company, Kedan Limited, said the absence of a direct flight from Wa to Accra or Kumasi was a big concern to him and his colleagues.

“It is so inconveniencing when you have an emergency business trip to make to Wa or from Wa to Accra,” he told the Daily Graphic.

“There were times that we needed to send samples from Wa to Accra for testing, and instead of a single day’s work, we spent so much time travelling by road,” he added.

Madam Elham Mumuni, a native, said she endured frustrating travels between Wa and Accra during her previous schedules because of the lack of a direct flight from Wa.

“I had to go and sleep in Tamale for a day before my scheduled flights, which added to the cost.

“A commercial flight to and from Wa is long overdue looking at the rate at which Wa is growing in commerce,” she stated.

 

 

Source: Graphic.com.gh

More Read

11 Arrested for Illegal Mining Activities in Pra Anum Forest Reserve
GPC2025 Calls for Stronger Domestic Resource Mobilisation to Accelerate National Development
Traditional medicine is now a global reality: WHO
SSNIT makes Annual Pensioner Certificate Renewal mandatory from April 2026
Transparency International rejects calls to scrap OSP as ‘unnecessary and premature’

 

Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print

Latest News

EC to hold Kpandai rerun on December 30
December 10, 2025
Mahama Ayariga, Dafeamekpor draft bill to scrap OSP
December 10, 2025
Gov’t withdraws lithium agreement for further stakeholder consultations
December 10, 2025
Mahama assents to COVID-19 Health Recovery Levy Repeal Act
December 10, 2025
Ghana’s economy records 5.5% growth in Q3 2025 — GSS
December 10, 2025
Govt introduces peak-hour bus services to cushion commuters in Accra
December 10, 2025
Ex-GIIF board member ordered to submit 16 Emeails in sky train trial
December 10, 2025

You Might Also Like

Breaking NewsGeneral Newstop stories

Prez Mahama to receive final Bawku peace mediation report on Thursday

December 9, 2025
Breaking NewsGeneral Newstop stories

Humanitarians launch $33 billion appeal for 2026

December 8, 2025
Breaking NewsGeneral Newstop stories

Parliament notifies EC over vacant Kpandai seat following court re-run order

December 8, 2025
Breaking NewsGeneral Newstop stories

Ghana, EU strengthen partnership to address Sahel security challenges

December 4, 2025

About Us

Public Agenda is fou­nded and owned by Pu­blic Agenda Communic­ations.

Public Agenda was founded as a public interest Me­dia entity. Its Visi­on is to contribute to building a well-i­nformed society where accurate informati­on dissemination is the cornerstone of a democratic, just and equitable society.

Its mission is to inform, guide and bui­ld responsible citiz­enship and accountab­le decision making and strive for excell­ence in the media in­dustry. Public Agenda Communications is managed by a Board of Directors.

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?