Public Agenda NewsPaperPublic Agenda NewsPaper
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Font ResizerAa
Public Agenda NewsPaperPublic Agenda NewsPaper
Font ResizerAa
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Search
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Follow US
Breaking NewsGeneral Newstop stories

Ghana’s Coal Power dream on course

Latifa Carlos
Last updated: November 13, 2017 12:20 pm
Latifa Carlos
Share
4 Min Read
Energy Round table discussion
Energy Round table discussion
SHARE

A feasibility studies to construct a 700 MW super critical clean coal power plant at Ekumfi Aboano in the Central Region has been concluded by a consortium comprising the Volta River Authority and Shenzhen Energy.

According to Mr Suleman Abubakari, Deputy Director of Distribution at the Ministry of Energy, the addition of a coal generation plant into the energy mix is to increase reliability and the prospects of economic pricing of power and its affordability.

Mr Abubakari noted that the Ministry is also taking steps to ensure that the already existing plants that are not operational due to technical problems would be restored to commence operation as quickly as possible.

More Read

NAIMOS, REGSEC dismantle illegal mining network in Oda River Forest Reserve
Gold Prices Plunge 6.3% in Largest Drop Since 2013
BoG Governor targets full de-dollarisation, wants cedi to be sole currency for all transactions
ISODEC to Plant 650 Trees to celebrate Ford Foundation’s 65 years in West Africa
Cedi erases Q3 losses recorded in 2025; posts 37% year-to-date appreciation against dollar

He said in the short term plan, over 1,000MW of generation capacity has been added to the installed generation capacity of the country since 2015 to bring the country’s installed generation capacity to 4,577MW by the end of August 2017.

The Ministry, he mentioned, is exploring the reverse flow of gas to Tema through the West African Gas Pipeline (WAGP) in the short term, as well as the construction of an overland/onshore pipeline from Aboadze to Tema (West-East pipeline) as an alternate gas transportation facility to the existing WAGP in the long term. This would convey indigenous gas from ‘’our’’ western gas discoveries to the east.

He was speaking during an Energy Roundtable conference which was organized in Accra recently by the Institute of Green Growth Solutions (IGGS) in partnership with the Konrad Adenauer Stiftung (KAS). The roundtable was held on the theme: ‘Ensuring a Sustainable and Efficient power sector.’

Dr. William Ahadzie, Director of Research, National Democratic Congress (NDC), in a presentation observed Ghana’s prolonged dependence on hydro generation was implicated in the energy shortfall that led to several rounds of load shedding over the years.

Dr Ahadzie added that, the energy sector itself has suffered from technical and commercial losses in power supply; aged, inadequate and unreliable energy infrastructure to meet growing demand.

Ghana’s per capita electricity consumption since 2010 has been 400kwh below the global average of 500kwh he said. He proposed that, government should support the Volta River Authority to construct a 75Megawatts Wind Park along the Eastern Corridor of the greater Accra Region to generate power from wind and also promote National LPG penetration (as contained in the Energy Sector Strategy and Development plan).

Institute of Statistical Social Economic Research (ISSER) notes that during the height of the energy crisis in 2014, Ghana lost production worth $2.1m a day or $55.8m a month. Firms without sufficient electricity experienced a drop in sales of about 37-48%.

Ghana lost an estimated $680m in 2014(2% of Gross Domestic Product) due to energy crisis a report by Institute of Statistical Social Economic Research (ISSER).

For the past few years, Ghana has been saddled with what is arguably the worst energy crisis in the history of the country. This situation led to many people losing their jobs and properties.

The crisis which was largely the result of low water inflows into the Akosombo Dam which limited the generation of hydroelectric power from the Akosombo Power Station; the two largest hydroelectric power generation plants in the country.

By: Latifa Carlos

Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print

Latest News

Resource Extraction, Climate Change Driving Inequality in West Africa — ISODEC
October 20, 2025
Assibey Antwi, Gifty Oware to face court today over NSA ghost names scandal
October 17, 2025
Govt spending falls 14% below target — BoG Report
October 13, 2025
GES to phase out double-track system by 2027 — GES
October 13, 2025
TUC warns of imminent water crisis, urges Mahama to declare State of emergency over galamsey
October 10, 2025
IMF reaches staff-level agreement with Ghana for $385m disbursement
October 10, 2025
High gold prices, poverty drive galamsey surge – Forestry Commission Board Chair
October 10, 2025

You Might Also Like

Breaking NewsGeneral Newstop stories

NAIMOS raids notorious ‘Gangway’ hideout at Aboso; arrests illegal Miners

October 7, 2025
Breaking NewsGeneral Newstop stories

LEG Submits inputs for Amendment of Minerals and Mining Act

October 7, 2025
Breaking NewsGeneral Newstop stories

Chairman Wontumi, two others charged over illegal mining activities

October 7, 2025
Breaking NewsGeneral Newstop stories

Govt approves GHC5 daily feeding for inmates – Prisons DG

September 30, 2025

About Us

Public Agenda is fou­nded and owned by Pu­blic Agenda Communic­ations.

Public Agenda was founded as a public interest Me­dia entity. Its Visi­on is to contribute to building a well-i­nformed society where accurate informati­on dissemination is the cornerstone of a democratic, just and equitable society.

Its mission is to inform, guide and bui­ld responsible citiz­enship and accountab­le decision making and strive for excell­ence in the media in­dustry. Public Agenda Communications is managed by a Board of Directors.

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?