Public Agenda NewsPaperPublic Agenda NewsPaper
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Font ResizerAa
Public Agenda NewsPaperPublic Agenda NewsPaper
Font ResizerAa
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Search
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Follow US
Breaking NewsGeneral News

Ghana Gas connects pipeline to Aboadze power enclave

Latifa Carlos
Last updated: April 10, 2019 2:57 pm
Latifa Carlos
Share
4 Min Read
SHARE

The Ghana National Gas Company (Ghana Gas) has successfully completed the tie-in of its 11-km gas pipeline from Atuabo to the West African Gas Pipeline at the Aboadze power enclave in the Shama District in the Western Region.

The project, which was completed ahead of schedule and within cost, is expected to pave the way for more reliable energy supply to power plants in Tema and Aboadze, as well as serve non-power gas users.

Following the completion of the tie-in, Ghana Gas is now producing 110 million standard cubic feet (mscf) a day, which can generate about 600 megawatts (MW) of power for the country.

More Read

Ghana calls for coordinated action to strengthen child protection systems
Dozens missing after boat carrying 100 migrants sinks off Senegal’s coast
Wassa group demands 10% mining equity, 2% mineral sales revenue in Takwa mines
Mahama orders nationwide performance assessment of all 261 MMDCEs
2027 Budget: Inside Mahama’s US$10bn New Economy programme

The visit

A team of officials from Ghana Gas and journalists went on a tour of the Aboadze power plant at Aboadze yesterday.

During the tour, the Communications Officer of Ghana Gas, Mr Ernest Owusu-Bempah, confirmed that the tie-in had been completed ahead of schedule and that what was left were some civil works that would be completed soon.

“The major work involving the tie-in and push gas to the Volta River Authority has been done. At the moment we are doing about 110mscf a day, which can generate about 600MW of power. What is left are some civil works that will be done soon,” he said.

 Power outage

The completion of the tie-in is expected to help reduce or eliminate the sporadic power outages the country is currently experiencing as a result of the shutdown and other technical challenges.

After the tie-in, the facility now has an integrated port system, which positions it to serve any plant — both power and non-power customers — in the enclave without shutting down to carry out a future hook-up to the metering station.

 Stranded gas

Mr Owusu-Bempah said with the completion of the tie-in, stranded gas would now flow to the plants in Tema for power generation.

Stranded gas is essentially gas that is wasted or unused. Meanwhile, Ghana has had to pay for gas produced by Eni-Ghana, whether it uses the gas or not. That arrangement is part of the contract between Ghana and Eni-Ghana for the Sankofa gas production

Currently, through the Takoradi metering and regulation station, 110mscf of gas is delivered to the VRA thermal plants at Aboadze daily.

Daily Graphic checks indicate that out of the 110mscf, VRA is only consuming about 100mscf because some of its generating units are being maintained.

 Demand of gas

The facility, henceforth, is best placed to distribute about 225mscf through the lines to the Tema enclave through the reverse line connection, while a total volume of 150mscf goes to VRA facilities.

From the same metering station, engineers explained, a total volume of 90mscf would be delivered to the Karpowership after its relocation to Sekondi in June. Amandi Energy would also be supplied with 90mscf.

The manufacturing sector, a ceramic factory in the enclave, is using about 10mscf to power its operations.

 

Source: Graphic.com.gh

Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print

Recent Posts

  • Ghana calls for coordinated action to strengthen child protection systems
  • Dozens missing after boat carrying 100 migrants sinks off Senegal’s coast
  • Wassa group demands 10% mining equity, 2% mineral sales revenue in Takwa mines
  • Mahama orders nationwide performance assessment of all 261 MMDCEs
  • 2027 Budget: Inside Mahama’s US$10bn New Economy programme
  • Gov’t won’t borrow to finance New Economy Programme – Ato Forson
  • ACA Participates in 15th VINACAS Golden Cashew Rendezvous in Vietnam
  • Farmers demand compensation over Newmont Ahafo North land acquisition
  • African Philanthropy Leaders Call for Collective Action to Drive Sustainable Development
  • Nkoranman Community Bank records 37% pre-tax profit growth
  • Ghana reaffirms commitment to women’s economic empowerment at Addis Ababa dialogue
  • Seven missing fishermen located in Togo’s waters – Western Regional Minister
  • Deploy more military, police to fight galamsey – Christian Council
  • Petrol, diesel prices set to fall from Oct. 16 as LPG faces 18.5% hike
  • IMF raises Ghana’s 2026 growth forecast to 5.7%, exceeding government’s target
  • CSOs, Fisheries Stakeholders Demand Revocation of Offshore Gold Licences
  • ActionAid ‘deeply alarmed’ by US government’s sanctions on the International Criminal Court
  • Mental Health Alliance Calls for 5% Employment Quota for Persons with Disabilities

You Might Also Like

Breaking NewsBusinesstop stories

Gov’t won’t borrow to finance New Economy Programme – Ato Forson

November 10, 2026
Breaking NewsGeneral Newstop stories

ACA Participates in 15th VINACAS Golden Cashew Rendezvous in Vietnam

November 5, 2026
Breaking NewsGeneral Newstop stories

Farmers demand compensation over Newmont Ahafo North land acquisition

November 5, 2026
Breaking NewsDevelopment Agenda

African Philanthropy Leaders Call for Collective Action to Drive Sustainable Development

November 4, 2026

About Us

Public Agenda is fou­nded and owned by Pu­blic Agenda Communic­ations.

Public Agenda was founded as a public interest Me­dia entity. Its Visi­on is to contribute to building a well-i­nformed society where accurate informati­on dissemination is the cornerstone of a democratic, just and equitable society.

Its mission is to inform, guide and bui­ld responsible citiz­enship and accountab­le decision making and strive for excell­ence in the media in­dustry. Public Agenda Communications is managed by a Board of Directors.

  • Contact us
  • Advertise with us
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?