Public Agenda NewsPaperPublic Agenda NewsPaper
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Font ResizerAa
Public Agenda NewsPaperPublic Agenda NewsPaper
Font ResizerAa
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Search
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Follow US
Breaking NewsGeneral News

Ghana Gas connects pipeline to Aboadze power enclave

Latifa Carlos
Last updated: April 10, 2019 2:57 pm
Latifa Carlos
Share
4 Min Read
SHARE

The Ghana National Gas Company (Ghana Gas) has successfully completed the tie-in of its 11-km gas pipeline from Atuabo to the West African Gas Pipeline at the Aboadze power enclave in the Shama District in the Western Region.

The project, which was completed ahead of schedule and within cost, is expected to pave the way for more reliable energy supply to power plants in Tema and Aboadze, as well as serve non-power gas users.

Following the completion of the tie-in, Ghana Gas is now producing 110 million standard cubic feet (mscf) a day, which can generate about 600 megawatts (MW) of power for the country.

More Read

ISODEC, Shai -Osudoku Assembly Honour Ford Foundation’s Legacy of Social Justice
NAIMOS, REGSEC dismantle illegal mining network in Oda River Forest Reserve
Gold Prices Plunge 6.3% in Largest Drop Since 2013
BoG Governor targets full de-dollarisation, wants cedi to be sole currency for all transactions
ISODEC to Plant 650 Trees to celebrate Ford Foundation’s 65 years in West Africa

The visit

A team of officials from Ghana Gas and journalists went on a tour of the Aboadze power plant at Aboadze yesterday.

During the tour, the Communications Officer of Ghana Gas, Mr Ernest Owusu-Bempah, confirmed that the tie-in had been completed ahead of schedule and that what was left were some civil works that would be completed soon.

“The major work involving the tie-in and push gas to the Volta River Authority has been done. At the moment we are doing about 110mscf a day, which can generate about 600MW of power. What is left are some civil works that will be done soon,” he said.

 Power outage

The completion of the tie-in is expected to help reduce or eliminate the sporadic power outages the country is currently experiencing as a result of the shutdown and other technical challenges.

After the tie-in, the facility now has an integrated port system, which positions it to serve any plant — both power and non-power customers — in the enclave without shutting down to carry out a future hook-up to the metering station.

 Stranded gas

Mr Owusu-Bempah said with the completion of the tie-in, stranded gas would now flow to the plants in Tema for power generation.

Stranded gas is essentially gas that is wasted or unused. Meanwhile, Ghana has had to pay for gas produced by Eni-Ghana, whether it uses the gas or not. That arrangement is part of the contract between Ghana and Eni-Ghana for the Sankofa gas production

Currently, through the Takoradi metering and regulation station, 110mscf of gas is delivered to the VRA thermal plants at Aboadze daily.

Daily Graphic checks indicate that out of the 110mscf, VRA is only consuming about 100mscf because some of its generating units are being maintained.

 Demand of gas

The facility, henceforth, is best placed to distribute about 225mscf through the lines to the Tema enclave through the reverse line connection, while a total volume of 150mscf goes to VRA facilities.

From the same metering station, engineers explained, a total volume of 90mscf would be delivered to the Karpowership after its relocation to Sekondi in June. Amandi Energy would also be supplied with 90mscf.

The manufacturing sector, a ceramic factory in the enclave, is using about 10mscf to power its operations.

 

Source: Graphic.com.gh

Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print

Latest News

Cedi erases Q3 losses recorded in 2025; posts 37% year-to-date appreciation against dollar
October 21, 2025
Resource Extraction, Climate Change Driving Inequality in West Africa — ISODEC
October 20, 2025
Assibey Antwi, Gifty Oware to face court today over NSA ghost names scandal
October 17, 2025
Govt spending falls 14% below target — BoG Report
October 13, 2025
GES to phase out double-track system by 2027 — GES
October 13, 2025
TUC warns of imminent water crisis, urges Mahama to declare State of emergency over galamsey
October 10, 2025
IMF reaches staff-level agreement with Ghana for $385m disbursement
October 10, 2025

You Might Also Like

Breaking Newstop stories

High gold prices, poverty drive galamsey surge – Forestry Commission Board Chair

October 10, 2025
Breaking NewsGeneral Newstop stories

NAIMOS raids notorious ‘Gangway’ hideout at Aboso; arrests illegal Miners

October 7, 2025
Breaking NewsGeneral Newstop stories

LEG Submits inputs for Amendment of Minerals and Mining Act

October 7, 2025
Breaking NewsGeneral Newstop stories

Chairman Wontumi, two others charged over illegal mining activities

October 7, 2025

About Us

Public Agenda is fou­nded and owned by Pu­blic Agenda Communic­ations.

Public Agenda was founded as a public interest Me­dia entity. Its Visi­on is to contribute to building a well-i­nformed society where accurate informati­on dissemination is the cornerstone of a democratic, just and equitable society.

Its mission is to inform, guide and bui­ld responsible citiz­enship and accountab­le decision making and strive for excell­ence in the media in­dustry. Public Agenda Communications is managed by a Board of Directors.

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?