Public Agenda NewsPaperPublic Agenda NewsPaper
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Font ResizerAa
Public Agenda NewsPaperPublic Agenda NewsPaper
Font ResizerAa
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Search
  • General News
  • Politics
  • Business
  • Health
  • Development Agenda
  • World News
  • Features & Opinions
  • Election watch
  • Editorial
Follow US
Breaking NewsGeneral News

Work to commence on concrete road project in Tema

Latifa Carlos
Last updated: April 27, 2018 12:31 pm
Latifa Carlos
Share
5 Min Read
Vice-President Mahamudu Bawumia (3rd right) being briefed on the project designs by officials of the Department of Urban Roads. With them are the Minister of Roads and Transport, Mr Kwasi Amoako-Atta (4thright) and Mr Titus-Glover (2nd right), the MP for Tema East.
Vice-President Mahamudu Bawumia (3rd right) being briefed on the project designs by officials of the Department of Urban Roads. With them are the Minister of Roads and Transport, Mr Kwasi Amoako-Atta (4thright) and Mr Titus-Glover (2nd right), the MP for Tema East.
SHARE

The Vice-President, Dr Mahamudu Bawumia, on Thursday cut the sod for work to begin on a 5.4-kilometre road from the Tema Steel Works Junction through the offices of the Driver and Vehicle Licencing Authority (DVLA) to the Tema Oil Refinery (TOR) Junction in Tema.

The project, being financed by the government of Ghana, is expected to be completed in 18 months.

The work will be undertaken by Messrs Joshob Construction Company and Lemef Construction Limited, both local companies.

A mini-durbar of the chiefs and people of the Tema Traditional Area and captains of industry was organised to herald the project.

More Read

NAIMOS, REGSEC dismantle illegal mining network in Oda River Forest Reserve
Gold Prices Plunge 6.3% in Largest Drop Since 2013
BoG Governor targets full de-dollarisation, wants cedi to be sole currency for all transactions
ISODEC to Plant 650 Trees to celebrate Ford Foundation’s 65 years in West Africa
Cedi erases Q3 losses recorded in 2025; posts 37% year-to-date appreciation against dollar

Significance

The Vice-President said the project was a pilot one that could be extended to some major roads in the country, since it was cheaper building a concrete road than an asphalt road.

According to him, the road was selected based on its functional use by heavy duty vehicles.

He said Tema had played a very important role in Ghana’s economy, as the metropolis was home to major industries, for which reason it was imperative that Tema was provided with durable roads that would link industries to the port and other parts of the country.

“There are heavy industries along the Tema Steel Works road. The road is at present in very poor condition and was serving as a disincentive to the industries situated along it.

“Consequently, it has become necessary for the government to address the poor nature of the road and ensure that roads in the industrial hub are in good condition. It is the expectation of the government that if the road is very well constructed and properly maintained, it should last a period of 40 years,” he said.

Agenda

Dr Bawumia said the Accra-Tema Motorway, which is Ghana’s first major road constructed in concrete to purposely link the harbour city of Tema with Accra, had survived above its design lifespan of 40 years.

He said as part of the government transformational agenda, it was going to construct concrete roads across the country to address the poor road network and aso reduce the burden of constantly sourcing funds to maintain roads.

Sustenance

He urged the Ministry of Roads and Highways to sustain its policy direction to use concrete as a preferred pavement feature for heavy-axle roads.

He further asked it to undertake research with regard to the use of local materials such as cement, aggregates and sand in road construction, with the aim of reducing cost incurred in constructing concrete roads.

“It is imperative to train young and upcoming engineers and contractors in the use of concrete as a pavement option in order to sustain the policy direction of the government aimed at improving road infrastructure,” he said.

Dr Bawumia appealed to Ghanaians to desist from activities that tended to reduce the lifespan of roads.

He mentioned overloading of vehicles, washing of vehicles on roads, unauthorised cutting or trenching across roads, driving on the shoulders of roads and the construction of unauthorised speed humps as some of the negative practices.

Advantages

The Minister of Roads and Highways, Mr Kwasi Amoako-Atta, said although the initial cost of concrete roads was relatively high, it was more economical, compared to asphalt roads, over a period of not less than 40 years.

He said the advantages associated with concrete roads, such as durability, safety, low carbon monoxide emission, less fuel consumption, resistance to oil spillage from vehicles, among others, far outweighed those of asphaltic and surface dressed roads.

He tasked the contractors undertaking the project to work to schedule and deliver quality, since “the ministry will not tolerate shoddy work”.

“Ghanaians deserve value for money being spent,” he emphasised.

Relief

The Deputy Minister of Transport and NPP Member of Parliment for Tema East, Mr Daniel Nii Kwatei Titus-Glover, observed that when the work was completed, it would bring relief to commuters.

While expressing appreciation for the Steel Works-DVLA-TOR road project, he called for the fast-tracking of processes on the proposed construction of an alternative road from the Valco Roundabout to Tema Manhean to reduce travel time and assess to social services.

 

Source:Graphic.com.gh

Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print

Latest News

Resource Extraction, Climate Change Driving Inequality in West Africa — ISODEC
October 20, 2025
Assibey Antwi, Gifty Oware to face court today over NSA ghost names scandal
October 17, 2025
Govt spending falls 14% below target — BoG Report
October 13, 2025
GES to phase out double-track system by 2027 — GES
October 13, 2025
TUC warns of imminent water crisis, urges Mahama to declare State of emergency over galamsey
October 10, 2025
IMF reaches staff-level agreement with Ghana for $385m disbursement
October 10, 2025
High gold prices, poverty drive galamsey surge – Forestry Commission Board Chair
October 10, 2025

You Might Also Like

Breaking NewsGeneral Newstop stories

NAIMOS raids notorious ‘Gangway’ hideout at Aboso; arrests illegal Miners

October 7, 2025
Breaking NewsGeneral Newstop stories

LEG Submits inputs for Amendment of Minerals and Mining Act

October 7, 2025
Breaking NewsGeneral Newstop stories

Chairman Wontumi, two others charged over illegal mining activities

October 7, 2025
Breaking NewsGeneral Newstop stories

Govt approves GHC5 daily feeding for inmates – Prisons DG

September 30, 2025

About Us

Public Agenda is fou­nded and owned by Pu­blic Agenda Communic­ations.

Public Agenda was founded as a public interest Me­dia entity. Its Visi­on is to contribute to building a well-i­nformed society where accurate informati­on dissemination is the cornerstone of a democratic, just and equitable society.

Its mission is to inform, guide and bui­ld responsible citiz­enship and accountab­le decision making and strive for excell­ence in the media in­dustry. Public Agenda Communications is managed by a Board of Directors.

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?